NewburyportNews.com, Newburyport, MA

Local News

September 9, 2013

National Grid to begin underground cable replacement

(Continued)

Shampine said the Mirra company is contractually obligated to restore all of the grassy areas and driveways that are disturbed by the installation process. An estimated six road crossings and approximately 14 driveways will be impacted. She said that the plan is to dig only a small trench across the affected area, not to bore under pavement or asphalt.

Shampine is “hopeful the work will be done quickly and we can avoid prolonged inconvenience” and sees the project as “a great step” in preventing further outages in the neighborhood. Customers will be notified in writing if — at any time — the planned work requires an interruption in power.

For more information about the project, Shampine can be reached at 978-725-1208 or at heather.shampine@nationalgrid.com.

Text Only | Photo Reprints

Port Pics
AP Video
Netanyahu Vows to Destroy Hamas Tunnels Obama Slams Republicans Over Lawsuit House Leaders Trade Blame for Inaction Malaysian PM: Stop Fighting in Ukraine Cantor Warns of Instability, Terror in Farewell Ravens' Ray Rice: 'I Made a Huge Mistake' Florida Panther Rebound Upsets Ranchers Small Plane Crash in San Diego Parking Lot Busy Franco's Not Afraid of Overexposure Fighting Blocks Access to Ukraine Crash Site Dangerous Bacteria Kills One in Florida Workers Dig for Survivors After India Landslide Texas Scientists Study Ebola Virus Smartphone Powered Paper Plane Debuts at Airshow Southern Accent Reduction Class Cancelled in TN
Special Features